Esh Construction has completed the first phase of infrastructure works on the £8.4m IAMP One scheme. The works, which commenced in February 2019 on the 150-ha International Advanced Manufacturing Park, have been delivered by Esh’s civil engineering division. One of… Continue Reading →
Building works have started on ‘Forest Park’; an exclusive 45-home development in Nottinghamshire, by property developer Taggart Homes. Located in the village of Annesley, in the Ashfield district of Nottinghamshire, the development has a prime position on Derby Road in… Continue Reading →
Underfloor air conditioning pioneer, AET Flexible Space, has won the ‘Retrofit Project of the Year’ at the H&V News Awards 2020 for its work supplying its system to the refurbishment of 24 St James Square. The judges commented that the… Continue Reading →
Ibstock Kevington, brickwork special shape and masonry fabrication company, have launched Nexus XI – a new, mechanically fixed brick-faced support system and lintel range – to further enhance the already popular Nexus offering. Nexus XI is both BBA accredited and… Continue Reading →
As part of a programme of works, which included several fire safety improvements throughout the building, Stella was approached by specialist heritage surveyors, Smith & Garratt to design a bespoke conservation rooflight. The design of which would need to provide… Continue Reading →
FIS has launched a Competency Framework Career and Qualification Path as the first in a structured approach to defining competency within the Finishes and Interiors Sector. The new Framework is built on the principles of the FIS Competency Skill, Attitude,… Continue Reading →
Selectaglaze secondary glazing creating quiet and comfortable areas for users of the new library in Plumstead Working with award winning architects Hawkins Brown Associates LLP and Main contractor Osborne Construction, 63 secondary glazed units have been installed during the remodelling… Continue Reading →
Exacta-boost can be retrofitted to existing ductwork systems of various dimensions to improve and control flow rates on a branch duct or to a critical area. Post COVID re-commissioning of buildings has increased ventilation requirements with greater airflow and more… Continue Reading →
© 2026 Refurb Projects — Sheen Publishing